- RR447 - Fast rescue craft recovery by installation crane. Phase 2
Phase 1 concentrated mainly on the environmental and operational problems associated with launch/recovery of the FRC such as pendulum effects, uncontrolled swinging, single point suspension and attachment of the crane hook to the craft especially in.
- JOB DESCRIPTION
The ultimate objective of this position is to ensure that all mechanical systems remain operative throughout the operation and comply with safety, regulatory body and test standards.
- REGULATION
Applicants not previously licensed in Connecticut shall meet the following qualifications: (1) Each applicant shall be at least 18 years of age; (2) Each applicant shall have at least two years of experience in the operation of a crane; and (3) Each.
|