- A Review of Drinking Water Legislation in British Columbia
Phase 2 2001 Board implements irrigation allotments 2002 Allotment with $100 fine for excess use 2003 Allotment with metered rate penalty for excess use, option to discontinue service at the board s discretion Phase 2 Allotments Equitable allocation.
- ADG 3-2006.p65
The principal tools, consistently used throughout these years, are tensiometers (Irrometers) and electrical resistance blocks (Watermarks... SECTOR: AGRICULTURE Subsector: IRRIGATION PROJECT or TITLE: CODE DESCRIPTION QUANTITY UNIT OF MEASURE 1,186 3,220.
- Turf Model TGA
The Adjustable Moisture Level SELECTOR can be compared to a thermostat, continuously measuring the soil moisture and signaling the Controller whenever a water application is desirable, or it prevents operation when there is no need for additional water.
- A Review of Drinking Water Legislation in British Columbia
Phase 2 2001 Board implements irrigation allotments 2002 Allotment with $100 fine for excess use 2003 Allotment with metered rate penalty for excess use, option to discontinue service at the board s discretion Phase 2 Allotments Equitable allocation.
- South East Kelowna Irrigation District Demand Management Project
In subsequent years the summer student was shared with SEKID.Two days a week were spent on the irrigation scheduling project collecting data, maintaining instruments and distributing reports, the remaining time the student worked for the irrigation.
|